Thursday, September 22, 2011

we are getting close-----

the dumpster is gone so we can actually see the entire front of the house now and it is almost finished. driveway will be poured hopefully on Tuesday!  we need the last set of 4 brackets stained and then the outside will just be short of driveway, sprinkler and landscaping.





i am waiting on one light fixture in the downstairs bathroom other than that, lighting is complete. we are waiting on doorknobs, which suffered a setback today with another delay, so i am on the prowl for new door knobs. all of the bathroom accessories arrived today so once we have doorknobs, the trim guys come back and install everything. i cant wait to see the kitchen pulls put on the white cabinets, i am hoping it is a winner.

here are a few shots of the inside and the exterior lighting.





the utility sink faucet was installed this week as well, here is a shot of the utility room  with the rocas azul limestone countertops, white extra deep sink and the gooseneck pull our sprayer faucet.




and jeremy's nerd photo, the network hub of the house is located in the utility room. looks like a messy wire area to me... he assures me that it is neat.


and last, another shot of my antique doors that were refinished and look absolutely amazing in this mud-room and utility area.